High Quality Commodity Mould, Plastic Safety Goggles Mould, Plastic Safety Goggles Mold Suppliers in China

Home > Products > Commodity Mould > High Quality Plastic Bottle Mould

High Quality Plastic Bottle Mould

Basic Info

Model No.:  TZRM-BM15365

Product Description

Model NO.: TZRM-BM15365 Surface Finish Process: Polishing Application: Commodity Design Software: Ug, Proe, CAD, Cae, Cam, Caxa Ect Certification: SGS Customized: Customized Mould Base: Lkm, Hasco Ect. Injection System: Pin-Point-Gate Trademark: REMO Origin: Taizhou China Shaping Mode: Injection Mould Plastic Material: PP, PC, PS, PE, PU, PVC, ABS, PMMA Ect. Runner: Hot/Cold Installation: Fixed Standard: HASCO Name: High Quality Plastic Bottle Mould Design Days: 3 Days Payment: by T/T Specification: International HS Code: 84807190 High Quality Plastic Bottle Mould

Remo is one of plastic mould leaders in China. We work to open new molds for various plastic products. We have the most advanced technology and sophisticated workers for making moulds. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

The following information will help you understand our molds better.

Mould Material           45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Cavity                           Single/multi
Runner                        Hot/cold
Mould Design            3D/2D Drawing
Design Software       UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material          PP, PC, PS, PE, PU, PVC, ABS, PMMA ect.
Mould Life                   300, 000-3, 000, 000 shots
Polish System           Mirror Polish
Payment                     40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time            15-60 days
                                                                                                               
Specification depends on customers' requirements.
Business Steps
1. R& D We support customers' R& D. We'll make the  files or improve the design if you need

 
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get.

 
3. Negotiation The negotiation includes quality, price, material, delivery time, payment item, ect.

 
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design

 
5. Mould We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days

 
6. Mould Testing When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.

 
7. Sample shoot If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.

 
8. Delivery We'll delivery goods either by sea or by air, according to customers' requirements.

Our advantages:

1; 10 years employees for Commodity Mould making
2; Over 500 commodity mould export every year
3; Over 10 countries of different commodity models
4; Excellent Cooling System with extended cooling pipe
5; Copper Cooling for better cooling effects
6; Pre-opening system to improve cycle time
7; Semi-Hot Runner System to save clients cost on moulds
8; Mould Available for recycle Material
9; Excellent control of polish system
10; Weekly report with mould processing photos available
11; Samples and each trial out video available
12; Punctual sample time and delivery time
13; Logistic service available
14; Engineers available in client's factory for training
15; High quality mould with reasonable price

WANT MORE DETAILS? WELCOME TO SEND US AN INQUIRY.





Contact us if you need more details on Plastic Bottle Mould. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Plastic Bottle Mold、Bottle Mould. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Commodity Mould